New railway overbridge at Tirupathur: Assistant Collector inaugurates!

 overbridgeAssistant Collector inaugurated the new overbridge constructed at a cost of Rs. 20 Crores in Thirupathur.

A new railway overbridge was constructed at the road from Asiriyarnagar, Thirupathur to the Village Pacchal at a cost of Rs. 20 Crores (Central government Rs. 10 Crores & State Government Rs. 10 Crores) was inaugurated.

Divisional Engineer Ravichandran presided.  Assistant Divisional Engineer Ms. Padmavathi welcomed the gathering.

Assistant Collector, Mr. Rangarajan, inaugurated the overbridge and distributed sweets.  All local senior officials participated.

159 total views, 2 views today

This entry was posted in Uncategorized. Bookmark the permalink.

Comments are closed.