Author Archives: admin

Power Shutdown in Thorapadi – 20/January/2018

Power Shutdown in Thorapadi areas has been scheduled on 20 January 2018 Saturday from 9.00 AM to 2.00 PM Bagayam, Edayansathu, Sitheri, Virupatchipuram, Palavansathu, Swami Nagar, Sainathapuram, Ezhil nagar, Ariyur, The maintenance work to be carried out in the Thorapadi … Continue reading

711 total views, no views today

Power Shutdown in Katpadi Areas 20-Jan-2018

Power Shutdown in Katpadi, Areas – 20 Jan 2018 : Power Shutdown in katpadi areas has been scheduled on 20 January 2018 Saturday Timings : 9.00 AM To 2.00 PM Katpadi, Gandhi Nagar, Chenguttai,, kalpudur, kangeyanallur, vandranthangal, Old katpadi, Vanjur, Kalinjur, … Continue reading

1,308 total views, no views today

Power Shutdown in Thorapadi Areas 20-Jan-2018

Power Shutdown in Thorapadi, Areas – 20 Jan 2018 : Power Shutdown in Thorapadi areas has been scheduled on 20 January 2018 Saturday Timings : 9.00 AM To 2.00 PM Bagayam, Edayansathu, Sitheri, Virupatchipuram, Palavansathu, Swami Nagar, Sainathapuram, Ezhil nagar, … Continue reading

955 total views, no views today

CMC opens off-site blood collection facility

  1,222 total views, no views today

1,222 total views, no views today

Power Shut Down Vellore Sathuvachari – 23 Dec 2017

Power Shutdown in Sathuvachari, Areas – 23 Dec 2017 : Power Shutdown in Sathuvachari areas has been scheduled on 23 December 2017 Saturday Timings : 9.00 AM To 2.00 PM Phase 1 To Phase 5, Sathuvachari, CMC Colony, Collector Office, Thendral … Continue reading

1,287 total views, no views today